2 BIGUES AND COLUMN 1

2 BIGUES AND COLUMN 1

Arrival at Bonneuil barge, a 250 tons and 46 meters long column is charged on the Volga HHL to South Korea. The welding and handling lashing are assigned to Promaritime.


Share this page

Share this page