E-Ship 1 docked at the port of Dieppe

E-Ship 1 docked at the port of Dieppe

This modern cargo carrying components of wind turbines landed at the port of Dieppe Friday, February 9, 2018.

The E-Ship stays on average four days at the dock. 4 cranes, 3 truck sets, 2 pilot cars and 2 forklifts are needed for unloading. 35 people are mobilized by the company PROMARITIME which is in charge of operations management.

Promaritime option in 2011 was to set port services and facility within the port of Dieppe, to allow a reliable and efficient manoeuvring range and logistic for power wind generators and easier inland busing to power area sites.

This challenge turns to be very successfull, resulting numerous wind generator cargo ships to call the port of Dieppe within the last five years.

Promaritime is very pleased to be parntering with ENERTEC to encourage such new port activity based on long and reliable term.

Download the full press release in PDF format


Share this page

Share this page