An electric transformer (56 tons) from Finland delivered by Promaritime

An electric transformer (56 tons) from Finland delivered by Promaritime

The Finland Service  of Promaritime took in charge a transformer of 56 Tons GW, with buxom dimensions L 5700 x W 2950 x H 3750 mm, from port of Rauma on the Finnish West Coast.

The design was insuring the sea transport, the port handling, the on-loading on heavy road- trailer, the off-loading at the factory and the final ripping on final bedding at the Jersey Electric Plant located at Perrier (Manche).


Share this page

Share this page